Electricians gone! Plumber ahead of schedule!

Things are looking good currently at Grange Cottage. Electricians have been in 2 weeks & have finished the 1st fix. It's taken me 20 mins to get to talk to the right person at npower, in order to get someone over to take out a meter(10 mins. less than it took the electrician) who was told he couldn't act on my behalf!
After several false starts with the bathroom equipment delivery (faulty parts, shower tray wrong size etc) i think we are ok. It was all bought on the internet so it's always a bit nerve racking. Everything was bought for under £1600, which included a showerbath & screen, 2 toilets 2 washbasins, large alcove shower & all taps & shower fittings, which i think was pretty good.
The plumber is progressing very well. Bath in, toilets & wash basins in. Shower tray is being fitted, after having had to ask the builder to level the floor.
We are going to have to get on with buying tiles this w/e as the plumber reckons he will be finished next week!!
Things are taking shape and our budget is looking ok too.


0 Comments:
Post a Comment
<< Home